Automatic door and glass door work shaped around real site use

Commercial Lobby Sliding Door Upgrade
The operator, sensor range, and opening pace were reset to improve peak-hour traffic flow and reduce entrance delays.

Retail Front Double Glass Door Hardware Refresh
Handles, patch fittings, and exposed hardware were replaced to unify the finish and improve day-to-day door feel.

Residential Clubhouse Automatic Door Maintenance
Routine inspection and adjustment were arranged for a high-traffic entrance, resolving sensor delay and operating noise.

Clinic Entrance Swing Door Operator Integration
The operator, activation controls, and safety return settings were coordinated to support more accessible entry use.

Office Glass Door Floor Spring Replacement
Oil leakage and unstable closing action were addressed by replacing the spring and recalibrating door alignment.

Mall Glass Door Handle and Fitting Update
Loose and dated fittings were replaced with hardware matched to the existing glass thickness and frontage finish.

Back-of-House Automatic Door Fault Review
Controls, sensors, and hardware wear were reviewed to restore daily access and reduce repeat faults.

Office Main Entrance Automatic Door Refurbishment
The entrance system was refreshed without changing the main frontage, improving both appearance and throughput.

Shopfront Glass Door Hardware Coordination
Locks, handles, and fittings were coordinated to give the new shopfront a more consistent finish and easier upkeep.

Community Facility Double Door Floor Spring Adjustment
Return speed and hold position were adjusted around door weight and usage level to reduce impact and misalignment.

Retail Entrance Scheduled Maintenance Plan
A scheduled service pattern was set up to address sensor sensitivity and ageing consumables before they caused trading-hour downtime.

Commercial Entrance Sensor Door Optimisation
Activation zones and door travel were refined to keep movement smoother during busy operating periods.
Want to browse the full year-by-year project record?
View Project Archive